Development Services (Permitting & Inspection)
240 Pine Avenue, Suite 300
Albany, Georgia 31701
Phone: (229) 438-3901 Fax: (229) 434-2687
To request an inspection Email: inspections@albanyga.gov or use your Permit Portal
Inspector Office Hours: By appointment.
The Department of Community Affairs has adopted new mandatory State Minimum Standard Codes with Georgia Amendments, which will become effective on January 1, 2026.
The new codes and amendments are as follows:
2024 International Residential Code (IRC) with Georgia Amendments
2024 International Building Code (IBC) with Georgia Amendments
2024 International Mechanical Code (IMC) with Georgia Amendments
2024 International Fuel Gas Code (IFGC) with Georgia Amendments
2024 International Plumbing Code (IPC) with Georgia Amendments
2024 International Swimming Pool and Spa Code (ISPSC) with Georgia Amendments
2026 Georgia Amendments to the 2023 National Electrical Code (NEC)
The new Georgia State Codes and Amendments will become effective on January 1, 2026. Copies of the current Georgia State Amendments are available on DCA's webpage at: https://dca.georgia.gov/scac
ALBANY PERMIT CENTER INSTRUCTIONS
The Albany Permit Center is the City’s electronic plan check system which allows you to submit a permit application online and upload plans for plan review. By submitting your plans in an electronic format (PDF), most of the cost associated with paper plans is eliminated and you can stay updated on the progress of your project. Click here for instructions.(PDF, 220KB)
Currently the Planning, Building, Engineering and Fire Departments are accepting electronic plans through the Permit Portal.
When a permit is purchased, it is the Applicants responsibility to contact our office and arrange the for required inspections and access to what is being inspected. Inspections can be requested through email @inspections@albanyga.gov or through the permit portal where you purchased the permit. Permits that have not been inspected within six months will change from an Issued status to a Void status. To reactivate the permit you will need to pay the Full permit fee again. Please call for the required inspections.
Please remember that replacement windows are required to meet the 2015 International Energy Conservation Code for Solar Heat Gain. The windows are shipped with stickers attached. Please do not remove these stickers until after you call for your final inspection and it has been approved. If the stickers are removed we cannot verify the correct windows have been installed and will result in the inspection failing.
Permitting Procedures(PDF, 146KB)
Albany Inspection FAQ(PDF, 115KB) (PDF, 57KB)
Scope of Work(PDF, 57KB)
Homeowner Permit Affidavit 2020(PDF, 141KB)
Remote Video Inspections(PDF, 157KB)
Restore Power Form (Used by licensed electricians)(PDF, 154KB)
Plan Resubmittal(PDF, 222KB)
Downloading Returned Plans(PDF, 326KB)
Proper Procedure To Securing A Building Or House(PDF, 92KB)
Name
|
Position
|
Room Number
|
Phone
|
Email
|
Sparky Lamb |
Building Official, CBO |
331 |
229-302-1850 |
slamb@albanyga.gov |
Danny Oliver |
Deputy Building Official, CBO |
322 |
229-302-1854 |
doliver@albanyga.gov |
Ole Laursen |
Plan Review/Inspections, CMO |
335 |
229-302-1851 |
olaursen@albanyga.gov |
Judy Glass |
Permitting |
TBD |
229-302-1852 |
jglass@albanyga.gov |
Georgia State Minimum Standard Codes
Code
|
Edition
|
Standard Building Code (International Building Code) |
2018 Edition |
Standard Fuel Gas Code (International Gas Code) |
2018 Edition |
Mechanical Code (International Mechanical Code) |
2018 Edition |
Plumbing Code (International Plumbing Code) |
2018 Edition |
National Electrical Code (Effective January 1, 2021) |
2018 Edition |
Fire Prevention Code (International Fire Code) |
2018 Edition |
International Energy Conservation Code |
2018 Edition |
International Swimming Pool and Spa Code |
2018 Edition |
International Fire Code |
2018 Edition |
Georgia Accessibility Code (ADA) |
2018 Edition |
Note: All of the above codes have Georgia State Amendments |
For more information on construction codes, visit Georgia Department of Community Affairs |
Permit Report
|
June 2024(PDF, 307KB) |
July 2024(PDF, 401KB) |
August 2024(PDF, 296KB) |
September 2024(PDF, 298KB) |
October 2024(PDF, 352KB) |
November 2024(PDF, 304KB) |
December 2024(PDF, 324KB) |
January 2025(PDF, 279KB) |
February 2025(PDF, 423KB) |
March 2025(PDF, 295KB) |
April 2025(PDF, 296KB) |
May 2025(PDF, 326KB) |
June 2025(PDF, 389KB) |
July 2025(PDF, 282KB) |
August 2025(PDF, 271KB) |